Step 1

Production of walls and installation of carpentry

At Danilith, we produce most of your home in the workshop, not on site. It is a practical and fast method , so we avoid any damage or loss of time potential , for example in bad weather. First of all, the facade elements are made according to a fully automated process. A robot places handmade bricks quickly, precisely and in the correct configuration.

Then come the joinery. The carpentry PVC shockproof is made in our workshops according to the latest production methods. Wood is naturally part of the possibilities. The system is designed so that the joinery fits perfectly into the walls. Moisture and drafts are excluded!

Then, the bricks receive a waterproof fiber concrete and insulation with the required bonding reinforcement. Work on the electrical installation and sanitary pipes is now being carried out. A layer of concrete based on expanded clay beads constitutes the inner envelope of the outer wall. The result is high quality, robust walls that fully meet current energy standards.

2nd step

Façade finishing and production of roof panels

This phase concerns the completion of facade elements. We erect the walls vertically in the workshop. Then, the finishing is done manually . We start by placing the blue stone thresholds before grouting the walls. Then we put insulating glazing in the carpentry. After a rigorous final inspection, we prepare the facades for transport.

After the manufacture and assembly of freestanding roof panels and specific elements such as roof windows, we bring the whole to the site.

Step 3

Work on the site

Our own transport service guarantees a perfect delivery of all items on the site. Because the foundations are already dug, we can immediately begin the assembly of the elements of facade and roofing.

We begin by placing the exterior and interior walls on the foundation beams and the raft. With its concrete structure, this constructive system is particularly resistant to fire. The floor of the floor is a concrete slab with a minimum thickness of 18 cm. The interior walls of the floor are then mounted. Finally, once the roof elements and wall panels are in place, the house is ready for completion .

 

Leave a Reply

Your email address will not be published. Required fields are marked *